Saturday, August 4, 2012

Cabinets and more!

Kitchen cabinet base done


Toilet kerb done due to level difference. I would still prefer if there is no kerb though.



Created a hole for our HDMI and Ethernet cable to go thru to living room.


This is where it comes out.


All our cabinets in the lift lobby!




Aircon guy also came on the same day.


 Our Mitsubishi Electric System 3



Oven tall cabinet



Cute little carpenter's tool box


Carpenter at work


Aircon guy at work. Noisy Saturday afternoon!



Trying to get the level right


Wifey is bored so doing some manicure.


Aircon is up and running!


Roller cabinetfor kitchen





Here comes the HDMI cable. Gotto get the Ethernet cable before they fix up the cabinet!


Our beloved Kraus sink!




The roller cabinet inplace. Carpenter need to redo it cos height not correct.

 

Kitchen Light. Love the slick look of it.



Toilet and service yard lights



Toilet pelmet lights.


»»  read more

Wednesday, August 1, 2012

Reno Progress - More tiles, more kitchen, more toilet

Our adjusted bedroom wall completed!



small kerb at bathroom entrance. no choice cos level cannot meet after taking the level from kitchen first.
Spotted a cracked thin tile. Need tiler to replace it. so thin! crack liao still install. haiz.


shower kerb done. waiting for glass shower screen


Before: Kitchen when tiles are hacked away.



After: new tiles laid over


Kitchen kerb almost done


Kitchen light switch shifted outside cos will be blocked by fridge.


Entrance tiles completed. Opt for a drop instead of a ramp.

»»  read more

Sunday, July 29, 2012

Reno Progress - Floor almost done

Flooring almost done.... 


Love the bright tiles.


A week later.... skirting also up. Floor 99% completed liao


Bought hood, hob, and multi-point instant heater


and oven delivered



»»  read more

Monday, July 16, 2012

Tiles and Hacking works

Selected our tiles from Soon Bee Huat
Living room and Kitchen wall tiles. We love bright house. So selected the brightest off white floor tiles and whitest wall tile for kitchen.


Here comes our living room tiles.


Our kitchen tiles


Contractor moved the materials up over the weekend

Hacking completed to the exposed wall area where new tiles will be laid. Didn't do overlay because kitchen is already very small. Overlay will make it even smaller. Un-hacked portion will be covered up by cabinets.



Master bedroom/common bedroom wall hacked to shift the wall back by about 100 for wardrobe. The current design is only suitable for swing wardrobe doors. However, we wanted sliding door. Depth not enough therefore got to sacrifice about 100mm of space from the common bedroom.




»»  read more