Wednesday, August 1, 2012

Reno Progress - More tiles, more kitchen, more toilet

Our adjusted bedroom wall completed!



small kerb at bathroom entrance. no choice cos level cannot meet after taking the level from kitchen first.
Spotted a cracked thin tile. Need tiler to replace it. so thin! crack liao still install. haiz.


shower kerb done. waiting for glass shower screen


Before: Kitchen when tiles are hacked away.



After: new tiles laid over


Kitchen kerb almost done


Kitchen light switch shifted outside cos will be blocked by fridge.


Entrance tiles completed. Opt for a drop instead of a ramp.