Sunday, July 29, 2012

Reno Progress - Floor almost done

Flooring almost done.... 


Love the bright tiles.


A week later.... skirting also up. Floor 99% completed liao


Bought hood, hob, and multi-point instant heater


and oven delivered



»»  read more

Monday, July 16, 2012

Tiles and Hacking works

Selected our tiles from Soon Bee Huat
Living room and Kitchen wall tiles. We love bright house. So selected the brightest off white floor tiles and whitest wall tile for kitchen.


Here comes our living room tiles.


Our kitchen tiles


Contractor moved the materials up over the weekend

Hacking completed to the exposed wall area where new tiles will be laid. Didn't do overlay because kitchen is already very small. Overlay will make it even smaller. Un-hacked portion will be covered up by cabinets.



Master bedroom/common bedroom wall hacked to shift the wall back by about 100 for wardrobe. The current design is only suitable for swing wardrobe doors. However, we wanted sliding door. Depth not enough therefore got to sacrifice about 100mm of space from the common bedroom.