Kitchen cabinet base done
Toilet kerb done due to level difference. I would still prefer if there is no kerb though.
Created a hole for our HDMI and Ethernet cable to go thru to living room.
This is where it comes out.
All our cabinets in the lift lobby!
Aircon guy also came on the same day.
Our Mitsubishi Electric System 3
Oven tall cabinet
Cute little carpenter's tool box
Carpenter at work
Aircon guy at work. Noisy Saturday afternoon!
Trying to get the level right
Wifey is bored so doing some manicure.
Aircon is up and running!
Roller cabinetfor kitchen
Here comes the HDMI cable. Gotto get the Ethernet cable before they fix up the cabinet!
Our beloved Kraus sink!
The roller cabinet inplace. Carpenter need to redo it cos height not correct.
Kitchen Light. Love the slick look of it.
Toilet and service yard lights
Toilet pelmet lights.
0 comments:
Post a Comment