Wednesday, August 1, 2012

Reno Progress - More tiles, more kitchen, more toilet

Our adjusted bedroom wall completed!



small kerb at bathroom entrance. no choice cos level cannot meet after taking the level from kitchen first.
Spotted a cracked thin tile. Need tiler to replace it. so thin! crack liao still install. haiz.


shower kerb done. waiting for glass shower screen


Before: Kitchen when tiles are hacked away.



After: new tiles laid over


Kitchen kerb almost done


Kitchen light switch shifted outside cos will be blocked by fridge.


Entrance tiles completed. Opt for a drop instead of a ramp.

»»  read more

Sunday, July 29, 2012

Reno Progress - Floor almost done

Flooring almost done.... 


Love the bright tiles.


A week later.... skirting also up. Floor 99% completed liao


Bought hood, hob, and multi-point instant heater


and oven delivered



»»  read more

Monday, July 16, 2012

Tiles and Hacking works

Selected our tiles from Soon Bee Huat
Living room and Kitchen wall tiles. We love bright house. So selected the brightest off white floor tiles and whitest wall tile for kitchen.


Here comes our living room tiles.


Our kitchen tiles


Contractor moved the materials up over the weekend

Hacking completed to the exposed wall area where new tiles will be laid. Didn't do overlay because kitchen is already very small. Overlay will make it even smaller. Un-hacked portion will be covered up by cabinets.



Master bedroom/common bedroom wall hacked to shift the wall back by about 100 for wardrobe. The current design is only suitable for swing wardrobe doors. However, we wanted sliding door. Depth not enough therefore got to sacrifice about 100mm of space from the common bedroom.




»»  read more

Wednesday, May 30, 2012

Some Planning


Did some planning before the renovation starts. Here's a preview. Layout more or less done.

»»  read more

Tuesday, May 29, 2012

Keys Collection!




















»»  read more

Monday, May 14, 2012

Wedding Venue

After searching online for our dream wedding venue, we came across a place called Burkill Hall. Located in the middle of National Orchid Garden, Singapore Botanic Gardens.

It is quite a nice place to hold wedding / solemnization. Too bad we had our solemnization already.

Source: http://www.sbg.org.sg

The access from Burkill Drive Way.

Lets start from the 2nd floor. The spacious hall. Bigger than we thought! can fit 140 guest. 100-120 guest comfortably.

Bridal's room. The only air-conditioned room in this hall.

The bridal's room private toilet. Super big! I think bigger than my current room.

Looking over the lawn from the 2nd floor patio where most solemnization was held.
Great for outdoor cocktails.

The 1st storey. Can fit about 120 guest. Round table can be shifted away.

Another view of the lawn from the car porch below the patio.

Commemorative plaque.

Since we entered the Burkill Hall which is inside the National Orchid Garden  from the side gate, might as well visit the orchid garden for free!

Weather very hot, walking towards the Cool House.

Opps didn't get a good background shot of the Cool House in full view.


»»  read more